Timiskaming Dam-Bridge of Quebec Replacement Project — Public Comments Invited
From: Canadian Environmental Assessment Agency
June 20, 2018 — Ottawa — Canadian Environmental Assessment Agency
The Canadian Environmental Assessment Agency (the Agency) has commenced a federal environmental assessment for the proposed Timiskaming Dam-Bridge of Quebec Replacement Project, located on the Ottawa River, at the border between the provinces of Quebec and Ontario.
The Agency invites the public and Indigenous Peoples to comment on which aspects of the environment may be affected by this project and what should be examined during the environmental assessment, as detailed in the draft Environmental Impact Statement (EIS) Guidelines. Comments received will be taken into consideration in finalizing the EIS Guidelines before issuing them to the proponent, Public Services and Procurement Canada.
This is the second of four opportunities for the public to comment on the environmental assessment of the project. All comments received will be considered public.
Written comments in either official language must be submitted by July 22, 2018 to:
Timiskaming Dam-Bridge of Quebec Replacement Project
Canadian Environmental Assessment Agency
901-1550 d’Estimauville Avenue
Québec, Quebec G1J 0C1
Telephone: 418-649-6444
Email: CEAA.Temiscamingue-Timiskaming.ACEE@ceaa-acee.gc.ca
Associated links
- Timiskaming Dam-Bridge of Quebec Replacement Project (Canadian Environmental Assessment Agency)
- Basics of Environmental Assessment (Canadian Environmental Assessment Agency)
Contacts
Marissa Harfouche
Communications Advisor
Canadian Environmental Assessment Agency
613-219-2789
Marissa.Harfouche@ceaa-acee.gc.ca
NT5
This article comes from NationTalk:
https://nationtalk.ca
The permalink for this story is:
https://nationtalk.ca/story/timiskaming-dam-bridge-of-quebec-replacement-project-public-comments-invited-2
Comments are closed.