You can use your smart phone to browse stories in the comfort of your hand. Simply browse this site on your smart phone.

    Using an RSS Reader you can access most recent stories and other feeds posted on this network.

    SNetwork Recent Stories

Imperial Reports Drilling at Mount Polley Extends Mineralization 885 Metres Beneath Springer Pit

by ahnationtalk on July 23, 20248 Views

Vancouver | July 22, 2024 | Imperial Metals Corporation (“Imperial” or the “Company”) (TSX:III) reports diamond drill results from the final 18 diamond drill holes from the Mount Polley 2024 exploration program, including a notable interval of 895 metres grading 0.26% copper and 0.32 g/t gold starting from a depth of 27.5 metres, including 342.5 metres grading 0.42% copper and 0.48g/t gold starting from 27.5 metres, in diamond drill hole SD-24-196. The 2024 drilling at Mount Polley followed up on the significant results obtained in the 2023 drill program which focused on the Springer zone at Mount Polley.

Hole SD-24-196 was an angled hole oriented at 155°/75° (strike/dip), collared in the floor on the south side of the Springer Pit. This hole, like the other holes in this drill program targeted gaps in drilling within the current pit designs (Phase 5 and 6 pits) in the Springer zone and also to test for extended mineralization at depth. The results confirm that copper-gold mineralization extends vertically beneath the floor of the Springer Pit for 885 metres. The results will be used to remodel the Springer zone mineralization, optimize the pit designs for the Springer Pit, increase resolution in mine scheduling and potentially to consider pit expansions and further drilling.

Read more: https://imperialmetals.com/assets/docs/2024-07-22-NR-III.pdf

BC4

Send To Friend Email Print Story

Comments are closed.

NationTalk Partners & Sponsors Learn More